Integral Coach Factory
- AOC value
- ₹12.17Cr
- AOC date
- 27 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 27 Mar 25AOC date
- -Published
- -Closes
- -Bid opens
- 27 Mar 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 27/03/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Under Frame Completeunder Frame Complete,Underframe Complete For Ac 2T Lhb/Asr To Drg. No. 85111001, Col-1, Alt L. Th E Schedule Of Technical Requirement As Per Icf/Md/Specn.147, Issue Status-01, Rev-02 With Amendment No.01 Special Condition : Packing Condition As Per Drg.No. Icf/J&T/Misc-2487, Alt B. The Under Frame Should Be Supplied As Normal Side Up And Side Bearer Side Down. [Saf Ety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]. Last date of submission for this tender is 2025-01-10. This is a Railway Ancillaries tender in chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free