Integral Coach Factory
- AOC value
- ₹72.01K
- AOC date
- 25 Apr
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 25 Apr 26AOC date
- -Published
- -Closes
- -Bid opens
- 25 Apr 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 25/04/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of copper tubular terminal ends , copper tubular terminal ends for crimping to aluminium conductorof size 120 sqmm with e- dia, 16.2mm. the terminal ends shall bedimensionally identical to cat n o.319-23 of jainson make. thematerial for copper shall conform to is - 1897(latest).{bra nd acceptable: dowells, lotus, jainson, uml, klippon,multi,ascon,ki,ecc.} [ warranty peri od: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-04-08. This is a Conductor tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free