Integral Coach Factory
- AOC value
- ₹1.32Cr
- AOC date
- 18 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 18 Dec 24AOC date
- -Published
- -Closes
- -Bid opens
- 18 Dec 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 18/12/2024
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of S & I Of Frp Panel In Ac Emus & I Of Frp Panel In Ac Emu,Supply And Installation Of Frp Side Wall Panel/ End Wall Panel To Drg.No. Em U/D/Er/Bt(776)-4-2-001, Col-I,Alt-Nil,Items-1 To 8,Frp Partition Panel To Drg.No. Emu/D/Mmts- 4-3-001, Col-I, Alt-Nil,Item - 1,Frp Roof Panel To Drg.No. Emu/D/Mmts-4-4-001, Col-I, Alt - D.Sp Ecification For Frp Panel Shall Be As Per Icf/Md/Spec - 167A, Issue Status-01,Rev-05 With Am D-01 To 04.Please Visit Icf Vendor Portal For Downloading Drawing Https://Vp.Icf.Gov.In/Vendtendordet New.Php Using Key: 0724Tl09kyr2386 [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] Furnishing Depot/Icf,Chennai, Tamil Nadu 65.00 Set. Last date of submission for this tender is 2024-11-21. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free