Integral Coach Factory
- AOC value
- ₹5.26L
- AOC date
- 15 Apr
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 15 Apr 26AOC date
- -Published
- -Closes
- -Bid opens
- 15 Apr 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 15/04/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Lateral Damper For Secondary-Air Spring Suspension Arrangementlateral Damper For Secondary-Air Spring Suspension Arrangement,Lateral Damper For Secondary-Air Spring Suspension Arrangement To Drg N O. Dc/Emu/M/Asr 0-5-005/Item-1, Alt `P And Guarantee Shall Be As Per Clause 8 Of Rdso Spe Cification C-8703 (Rev-3)----(With Latest Revision And Amendment) [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ] => Limited. Last date of submission for this tender is 2026-02-09. This is a Ventilation Dampers tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free