Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of self priming mono block pump assembly required for vb sleeper , self-priming mono block pump assembly (positive mounting arrangement) with controll er to rcf specification no.edts-186, rev.a, amd-l and 2, corr.1 and 2, annexure-1. the drg. no. cc71 325, alt-c for pump mounting frame where ever mentioned in the specification/drawing shall be read as icf/sk3-7-1-127 alt-nil or latest. packing instruction: pi 146, ver 2.0. [ warranty period: 30 mont hs after the date of delivery ] ]. Last date of submission for this tender is 2026-08-04. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
Unlock the Tender details for free

