Integral Coach Factory
- AOC value
- ₹8.87L
- AOC date
- 17 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 17 Dec 25AOC date
- -Published
- -Closes
- -Bid opens
- 17 Dec 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 17/12/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Pre-Wired Rmvu Control Panel To Icf/Sk3-7-5-039 And Icf/Sk3-7-2-086Pre-Wired Rmvu Control Panel To Icf/Sk3-7-5-039 And Icf/Sk3-7-2-086,Pre-Wired Rmvu Control Panel To Icf/Sk3-7-5-039, Alt- A For 3 Phase Non Ac Emu With Autom Atic Sliding Doors And Vestibule. Note: Quantity Required Per Rake Is 20 Numbers [ Warranty Period: 30 , Pre-Wired Rmvu Control Panel To Icf/Sk3-7-2-086, Alt- A For 3 Phase Non Ac Emu With Autom Atic Sliding Doors And Vestibule Note: Quantity Required Per Rake Is 4 Numbers [ Warranty Period: 30 Mo => Limited. Last date of submission for this tender is 2025-12-10. This is a Control Panel tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free