Integral Coach Factory
- AOC value
- ₹86.69L
- AOC date
- 12 May
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 12 May 26AOC date
- -Published
- -Closes
- -Bid opens
- 12 May 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 12/05/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of s&i of e.p brake, for emu/c, emu/b and emu/hc required for titagarh , supply & installation: scope of supply of supply of e.p brake equipment for mrvc/c/bt coaches to rdso specification rdso/2013/cg-03 (latest revision /amendment)and to material schedule no.icf/sk-10-2-573,issue status:01,rev.03,cs-01,cs-0 2 &cs-03 installation: installation to be done as per scope of installation & testing icf/ mfpl/170/001, issue status-01,rev-02,amd-01 and schedule of drawing and permissible tim ings icf/mfpl/170/573, issue status-01,rev-00. note: qty required per rake =4 sets [ warra nty period: 36 months after the date of delivery ] ] , supply & installation: scope of supply of e.p brake equipment for mrvc/d/hc/ bt coaches to rdso specification rdso/2013/cg-03 ( latest revision/amendment)and to m aterial schedule no.icf/sk-10-2-576,issue status 01, rev.03,cs-01, cs-02 ,cs-03 & cs-04. inst allation: installation to be done as per scope of installation & testing icf/mfpl/170/001, issue status-01,rev-02,amd-01 and schedule of drawing and permissible timings. - icf/mfpl/170/576 , issue status-01, rev-00. note: qty required per rake = 2 sets [ warranty period: 36 months after the date of delivery ] ] , supply & installation: scope of supply of e.p brake equipment for mrvc/m/bt coaches to rdso specification rdso/2013/cg-03(latest revision/amendment) and to mate rial schedule no icf/sk-10-2-574 ,issue status-01, rev-03,cs-01,cs-02 & cs-03.. installation: installation to be done as per scope of installation & testing icf/mfpl/170/001, issue sta tus-01,rev-02,amd-01 and schedule of drawing and permissible timings. icf/mfpl/170/574, i ssue status-01, rev-00. note: qty required per rake = 4 sets [ warranty period: 36 months after the date of delivery ] ]. Last date of submission for this tender is 2026-04-08. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free