Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of set of panels edts-355 us water tank , set of panels to edts-355, rev-1, amd-1 to 6 (amendment-5 not applicable) with pump circuit switch gears for lhb non-ac scn coaches with under slung water tank. note: 1. low voltage p anel shall be supplied as per rcf drg.no. cc-72445 alt-a or latest and additional requirement, top & b ottom cable entry holes & earthing lugs shall be provided as per icf drg.no icf/sk3-7-2-082 alt-nil or l atest. 2. drg.no.ls71103 alt-a anx-1&2 shall be followed for door stopper arrangement and stiffener i n hv panel. 3. drg.no.sked-646 icf anx-2 shall be followed for hv panel lh & rh side holes, wsp mo unting holes & provision of poly-carbonate sheet. 4. the rbc cum ebc mcbs and its indications shall be provided in the hv & lv panels as per rdso modification sheet no. rdso/pe/ms/ac/0094-2024 (re v 0) and rdso/pe/ms/ac/0095-2024 (rev 0). 5. provision of individual mpcb for water pump & mounti ng provision of its controller shall be provided as per the rdso modification sheet no. rdso/pe/ms/tl/ 0090-2023 (rev-0). 6. packing instruction: pi-115 ver 3.0. [ warranty period: 30 months after the d ate of delivery ] ]. Last date of submission for this tender is 2026-07-02. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

