Integral Coach Factory
- AOC value
- ₹16.91L
- AOC date
- 7 Feb
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 7 Feb 26AOC date
- -Published
- -Closes
- -Bid opens
- 7 Feb 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 07/02/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Spring Pad Bottom Monoblockspring Pad Bottom Monoblock,Spring Pad Bottom Monoblock To Medha Drg:D-A675uv2-181310 Rev-03. The Fir M Shall Fulfil The Manufacturing Facility As Per Icf/Md/Spec-440, Issue Status-01,Rev-00. Special Condition : Suitable Packing To Be Done To Prevent Damage During Transit, Unloadi Ng And Rust Prevention During Storage. [ Warranty Period: 30 Months After The Date Of Deliv Ery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]. Last date of submission for this tender is 2025-11-28. This is a Springs tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free