Integral Coach Factory
- AOC value
- ₹2.72Cr
- AOC date
- 1 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 1 Nov 23AOC date
- -Published
- -Closes
- -Bid opens
- 1 Nov 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 01/11/2023
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Under Frame Front Part For Lhb Eog Coaches To Drg.No.58111003, Alt S. The Manufacturing Facility Requirement As Per Icf / Md / Spec-147, Issue Status-01, Rev- 02, Amendment No-01. Special Condition : I ) The Under Frame Front Part Should Be Supplied With Normal Side Up And Side Bearer Side Down. Ii ) All Loose Items Must Be Packed In Eco Friendly Material Box And Suitably Labeled. [ Safety Item ] [ Warranty Period: 30 Months After The Date Of Delivery ] . Last date of submission for this tender is 2023-08-25. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free