Integral Coach Factory
- AOC value
- ₹8.47Cr
- AOC date
- 28 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 28 Oct 26AOC date
- -Published
- -Closes
- -Bid opens
- 28 Oct 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 28/10/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Short dated tender - Corrigendum : Supply Of s&i ep brake equipment for ebu and mbu for emu rakes , supply, installation and commissioning of ep brake equipment for end basic unit for em u rakes to rdso specification rdso/2013/cg-03 ( latest revision /amendment) as follows: 1.for emu d coach to material schedule no.icf/sk-10-2-575,issue status-01, rev.03. cs-01, cs-02, cs-03, cs-04 and c s-05, qty-1 set 2.for emu b coach to material schedule no icf/sk-10-2-574,issue status-01, rev-03, cs-0 1, cs-02, cs-03 and cs-04, qty-1 set 3.for emu c coach to material schedule no.icf/sk-10-2-573,issue st atus:01, rev.03, cs-01, cs-02, cs-03 and cs-04, qty -1 set installation : installation to be done as per scope of installation & testing icf/mfpl/170/001, issue status-01,rev-02,amd-01,schedule of drawing and permissible timings for (a) emu d coach: icf/mfpl/170/575, issuestatus-01, rev-00. (b) emu b coach: icf/mfpl/170/574, issue status-01, rev-00. (c) emu c coach: icf/mfpl/170/573, issue status-01, rev-00. not e: 1. packing condition shall be as per doc.no.pc-052 of icf/md/spec-485. 2. quantity required per rak e: 2 sets [ warranty period: 36 months after the date of delivery ] ] , supply,installation and commissioning of ep brake equipment for middle basic unit for emu rakes to rdso specification rdso/2013/cg-03 ( latest revision / amendment) as follows: 1. for e mu dhc coach to material schedule no. icf/sk-10-2-576, issue status-01, rev.03, cs-01, cs-02 , cs-03, cs -04 and cs-05, qty-1 set 2. for emu b coach to material schedule no icf/sk-10-2-574,issue status-01, re v-03, cs-01, cs-02, cs-03 and cs-04, qty-1 set 3. for emu c coach to material schedule no.icf/sk-10-2-57 3, issue status:01, rev.03, cs-01, cs-02, cs-03 and cs-04, qty -1 set installation :.installation to be do ne as per scope of installation & testing icf/mfpl/170/001, issue status-01,rev-02,amd-01,schedule of drawing and permissible timings for (a) emu dhc coach: icf/mfpl/170/576 , issue status-01, rev-00. (b) emu b coach: icf/mfpl/170/574, issue status-01, rev-00. (c) emu c coach: icf/mfpl/170/573, issue status-0 1, rev-00. note: 1. packing condition shall be as per doc.no.pc-052 of icf/md/spec-485. 2. quantity req uired per rake: 2 sets [ warranty period: 36 months after the date of delivery ] ]. Last date of submission for this tender is 2026-09-16. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free