Integral Coach Factory
- AOC value
- ₹1.91L
- AOC date
- 24 Feb
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 24 Feb 26AOC date
- -Published
- -Closes
- -Bid opens
- 24 Feb 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 24/02/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Unf Straight Connector Nw36 Dia 40Mmunf Straight Connector Nw36 Dia 40Mm,Straight Connector Fittings Suitable To Connect Flexible Corrugated Con Duit Nw36 And To Rigid Metal Conduits Dia 40Mm With Clamps To Spec.No.Rdso/Pe/Spec/Ac/ 0138-2009,Rev-1,Annexure-A, A14 Sl. No-4 And Similar To Model No.Bvnr-Rem406-50 Of Pma. [ Warranty Period: 30 Months After The Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2026-01-22. This is a Clamps tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free