Integral Coach Factory
- AOC value
- ₹1.89Cr
- AOC date
- 15 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 15 Sep 23AOC date
- -Published
- -Closes
- -Bid opens
- 15 Sep 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 15/09/2023
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply And Installation Of One Coach Set Of Seats And Berth Complete For Lwscwac / Eog Coaches To Drg.No.Lwscwac / Eog-6-1-001, Alt- J, Col-I. ( Except Item-13 ) . Cushioning Material Shall Pu Foam As Per Mcf Specification No. Mmdts 19020 Rev-05 Or Latest Without Fire Barrier Cloth To Mcf Specification Mmdts 19021. Thickness Of Cushion Shall Be As Per Rcf Drgs.Lw61348, Lw61349 Alt-B, Lw61350 Alt-A, Lw61351, Lw61352 Alt-B, Lw61366 Alt-B, Mi007127 Alt-A, Mi007053 Alt-A, Mi007126 Alt-A. Safety Rail Back Piece For Upper Berth To Be Modified Accordingly. Installation Required As Per Arrangement Drawing. All Necessary Hardwares Required For Installation Is Under, => Limited. Last date of submission for this tender is 2023-09-08. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free