Integral Coach Factory
- AOC value
- ₹16.7Cr
- AOC date
- 1 Jul
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 1 Jul 26AOC date
- -Published
- -Closes
- -Bid opens
- 1 Jul 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 01/07/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Corrigendum : Supply Of s&i test and commiss of e.p brake for mrvc/c/bt,memundmc/3ph and memu/dmc/3ph coaches for memu medha 12 car rakes - 33 rakes , supply and installation of e.p brake equipment for memu/dmc/3ph coaches to rdso speci fication rdso/2013/cg-03 (latest revision/amendment) and to material schedule no.icf/sk-10-2-645,iss ue status-01,rev-00,cs-01,cs-02,cs-03 & cs-04.. installation: installation to be done as per scope of i nstallation & testing icf/mfpl/170/001,issue status -01,rev-02,amd-01 and schedule of drawing and p ermissible timings. icf/mfpl/170/645, issue status -01,rev-00. note: quantity required per rake: 2sets [ warr anty period: 36 months after the date of delivery ] ] , supply & installation of e.p brake equipment for mrvc/c/bt coaches to rdso specificatio n rdso/2013/cg-03 (latest revision /amendment)and to material schedule no.icf/sk-10-2-573,issue atu s:01,rev.03,cs-01,cs-02 &cs-03 installation: installation to be done as per scope of installation & te sting icf/mfpl/170/001, issue status-01,rev-02,amd-01 and schedule of drawing and permissible timing s icf/mfpl/170/573, issue status-01,rev-00. note: quantity required per rake: 9 sets [ warranty period: 36 mo nths after the date of delivery ] ] , supply and installation of e.p brake equipment for memu/ndmc/3ph coaches to rdso spe cification rdso/2013/cg-03 (latest revision/amendment) and to material schedule no. icf/sk-10-2-697, issue status-01, rev-00. installation: installation to be done as per scope of installation and testi ng icf/mfpl/170/001, issue status-01, rev-02, amd-01 and schedule of drawings and permissible timing s as per icf/mfpl/170/782, issue status-01, rev-00. note: quantity required per rake: 1set [ warranty period: 36 months after the date of delivery ] ]. Last date of submission for this tender is 2026-05-13. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free