Integral Coach Factory
- AOC value
- ₹79.23L
- AOC date
- 2 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 2 Dec 25AOC date
- -Published
- -Closes
- -Bid opens
- 2 Dec 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 02/12/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Supply And Installation Of Bio Retention.Supply And Installation Of Bio Retention.,Supply And Installation Of Bio Retention Tank (Rh) To Drg.No.727-6-3-012 As P Er Specn.Icf/Md/Spec-254,Issue Status-01,Rev-02 With Amd-01 For Train Set Coaches. [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] , Supply And Installation Of Bio Retention Tank (Lh) To Drg.No:727-6-3-005,Alt-G As Per Specn.Icf/Md/Spec-254,Issue Status-01,Rev-02 With Amd-01 For Train Set Coaches. [ W Arranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]. Last date of submission for this tender is 2025-09-12. This is a Water Tank tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free