Integral Coach Factory
- AOC value
- ₹1.4Cr
- AOC date
- 1 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 1 Aug 24AOC date
- -Published
- -Closes
- -Bid opens
- 1 Aug 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 01/08/2024
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of 1Rake Set Of Axle End Cover-Speed Sensor1rake Set Of Axle End Cover-Speed Sensor,One Rake Set Of Axle Box Front Cover For Vb/Ts Consisting Of 1) Axle Box Front Cover With One Sens Or (Lh) To Medha Drg No C-A675uv2-135627,Rev-03 - Qty-28 Nos, 2) Axle Box Front Cover With One Sensor ( Rh) To Medha Drg No C-A675uv2-135334,Rev-02 - Qty-28 Nos, 3) Axle Box Front Cover With Two Sensor (Lh) To Medha Drg No C-A675uv2-135962,Rev-02 - Qty-4 Nos, 4) Axle Box Front Cover With Two Sensor (Rh) To M Edha Drg No C-A675uv2-135335,Rev-01 - Qty-4 Nos, 5) Axle Box Front Cover For Tacho Generator To Medha Drg No C-A675uv2-135336,Rev-02 - Qty-4 Nos, Special Condition : There Will Be Minor Modification In Design Firm May Be Advised To Collect Final Drawing Before Manufacturing Suitab Le Packing To Be Done To Prevent Damage During Transit. [ Warranty Period: 30 Months After The Date Of Delivery ] => Limited. Last date of submission for this tender is 2024-06-25. This is a Railway Ancillaries tender in chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free