Integral Coach Factory
- AOC value
- ₹35.57Cr
- AOC date
- 18 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 18 Sep 26AOC date
- -Published
- -Closes
- -Bid opens
- 18 Sep 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 18/09/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of sni of vb sleeper sealed gangway , supply and installation of fully sealed gangway with foot plate along with inner and outer fairings fo r emu trainset (to be operated at 160 kmph speed /180 kmph test speed) ref.drg.no. a01-2-5-001,latest alteration (refered for overall dimention and coordinates only) and track parameters to drg.no.a01-2-5-002, latest alteration as per specification icf/md/spec.-369,issue status-01,rev-00, amd-05. [ warranty period: 36 months after the date of delivery ] ] , supply of must change items and carrying out of 9 monthly maintenance schedule for vb sleeper fully s ealed gangway to drg no.vbs/dtc/cn(a01)-25-001 and to icf/md/spec.369 (latest) for trainset vb sleeper. note: schedul e shall confirm to report on shop schedule activities for vande bharat trainset published by camtech, oem manual a nd annexure - ac rev-01 of icf/md/spec.369. [ warranty period: 2 years, amc period: 7 years, rate of discounting: 10 % ] ] , supply of must change items and carrying out of ss1 maintenance schedule for vb sleeper fully sealed g angway to drg no.vbs/dtc/cn(a01)-2-5-001 and to icf/md/spec.369 (latest) for trainset vb sleeper. note: schedule shal l confirmto report on shop schedule activities for vande bharat trainset published by camtech, oem manual and ann exure - ac rev-01 of icf/md/spec.369 [ warranty period: 4 years, amc period: 4 years, rate of discounting: 10 % ] ] , supply of must change items and carrying out of ss2 maintenance schedule for vb sleeper fully sealed g angway to drg no.vbs/dtc/cn(a01)-2-5-001 and to icf/md/spec.369 (latest) for trainset vb sleeper. note: schedule shal l confirm to report on shop schedule activities for vande bharat trainset published by camtech, oem manual and an nexure - ac rev-01 of icf/md/spec.369. [ warranty period: 3 years, amc period: 4 years, rate of discounting: 10 % ] ] , supply of must change items and carrying out of ss3 maintenance schedule for vb sleeper fully sealed g angway to drg no.vbs/dtc/cn(a01)-2-5-001 and to icf/md/spec.369 (latest) for trainset vb sleeper. note: schedule shal l confirm to report on shop schedule activities for vande bharat trainset published by camtech, oem manual and an nexure- ac rev-01 of icf/md/spec.369. [ warranty period: 6 years, amc period: 4 years, rate of discounting: 10 % ] ] , supply of ceiling arrangement system part of vb sleeper fully sealed gangway to drg no.vbs/dtc/cn(a01) -2-5-001 and to icf/md/spec 369. [ warranty period: 2 years, amc period: 8 years, rate of discounting: 10 % ] ] , supply of set of flexible tread plate system part of vb sleeper fully sealed gangway to drg no.vbs/dtc/c n(a01)-2-5-001 and to icf/md/spec-369.(latest). [ warranty period: 2 years, amc period: 8 years, rate of discounting: 10 % ] ] , supply of bridge plate system part of vb sleeper fully sealed gangway to drg no.vbs/dtc/cn(a01)-2-5-001 and to icf/md/spec 369. [ warranty period: 2 years, amc period: 8 years, rate of discounting: 10 % ] ] , supply of quick release latching system part of vb sleeper fully sealed gangway to drg no.vbs/dtc/cn(a 01)-2-5-001 and to icf/md/spec-369 (latest). [ warranty period: 2 years, amc period: 8 years, rate of discounting: 10 % ] ] , supply of vehicle mounting plate part of vb sleeper fully sealed gangway to drg no.vbs/dtc/cn(a01)-2-5-0 01 and to icf/md/spec 369. [ warranty period: 2 years, amc period: 8 years, rate of discounting: 10 % ] ] , supply of inner flexible panels/side panel rhpart of vb sleeper fully sealed gangway to drg no.vbs/dtc/c n(a01)-2-5-001 and to icf/md/spec-369(latest). [ warranty period: 2 years, amc period: 8 years, rate of discounting: 10 % ] ] , supply of inner flexible panels/side panel lh part of vb sleeper fully sealed gangway to drg no.vbs/dtc/c n(a01)-2-5-001 and to icf/md/spec-369 (latest). [ warranty period: 2 years, amc period: 8 years, rate of discounting: 10 % ] ]. Last date of submission for this tender is 2026-06-01. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free