Integral Coach Factory
- AOC value
- ₹2.66Cr
- AOC date
- 18 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 18 Sep 25AOC date
- -Published
- -Closes
- -Bid opens
- 18 Sep 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 18/09/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Under Frame (Km Tc)Under Frame (Km Tc),Underframe Arrgt For Kolkata Metro Tc Medha To Drg No. (984) Mrm2/Tc-1-1- 001, Alt D Col-1 Schedule Of Technical Requirement As Per Icf/Md/Specn.147, Issue Status- 01 Rev.02 With Amendment-01. Special Condition : The Under Frame Should Be Supplied As Nor Mal Side Up And Side Bearer Side Down Packing To Drg No. Icf/J&T/Misc-2487, Alt-B [Safety It Em] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]. Last date of submission for this tender is 2025-07-14. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free