Integral Coach Factory
- AOC value
- ₹26.24Cr
- AOC date
- 21 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 21 Sep 26AOC date
- -Published
- -Closes
- -Bid opens
- 21 Sep 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 21/09/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of supply, installation and commissioning of electro pneumatic wheel mounted brake system i.e. brake eqpt-middle basic unit (mbu), end-basic unit (ebu) and its maintenance schedule for vande bharat sleeper rakes , supply, installation and commissioning of electro pneumatic wheel mounted brake sys tem for end basic unit of 160 kmph emu train set as per rdso specification no.rdso/cg/s/25010(rev-00 )(latest revision/amendment) along with annexure to rdso spec rdso/cg/s/25010-rev-00(scheduled maintenance rate contract of brake system for 160 kmph trainset),annexure trainset-aj,rev-02,dat ed-22-04-2026. note : 1. auxiliary air supply unit is not part of scope of supply. 2. the firm shall supply one laptop f or every 2 rakes (assuming 24 cars per rake) as per rdso/cg/s/25010, rev-0, annexure trainset-aj, rev-02. 3. b rake pad shall comply with rdso specification no.rdso/2013/cg-01,latest revision/amendment. 4.bra ke disc shall comply with rdso specification no.rdso/2017/cg-02,latest revision/amendment. 5. packi ng condition shall be as per doc.no.pc-052 of icf/md/spec-485. 6. quantity required for end basic unit (ebu) per rake : 2 sets [ warranty period: 30 months after the date of delivery ] ] , supply, installation and commissioning of electro pneumatic wheel mounted brake sys tem for middle basic unit of 160 kmph emu train set as per rdso specification no. rdso/cg/s/25010-re v-00,(latest revision/amendment) along with annexure to rdso spec rdso/cg/s/25010-rev-00(schedul ed maintenance rate contract of brake system for 160 kmph trainset),annexure trainset-aj,rev-02,d ated-22-04-2026. note : 1. auxiliary air supply unit is not part of scope of supply. 2. the firm shall supply one lapto p for every 2 rakes (assuming 24 cars per rake) as per rdso/cg/s/25010, rev-0, annexure trainset-aj, rev-02. 3. brake pad shall comply with rdso specification no.rdso/2013/cg-01,latest revision/amendment. 4.br ake disc shall comply with rdso specification no.rdso/2017/cg-02,latest revision/amendment. 5. pack ing condition shall be as per doc.no.pc-052 of icf/md/spec-485. 6. quantity required for mbu per rake : 4 se ts [ warranty period: 30 months after the date of delivery ] ] , schedule maintenance with supply of must change items and carrying out schedule mai ntenance at 27 months , 36 months (ss2) ,45 months , 54 months(ss1) , 63 months and 72 months (ss3 ) for complete rake of ep brake system of 160kmph train set comprising of 2 end basic units and 4 mi ddle basic units to rdso spec. rdso/cg/s/25010 rev.0)latest revision / amendment (without auxiliary air supply unit) for trainset vb sleeper. note: 1. schedule shall confirm to correction slip-1 for va nde bharat express trainset (v2.0) maintenance manual, volume-ii published by camtech and annexu re to rdso spec. no. rdso/cg/s/25010(rev.0) latest revision / amendment. 2. any updates or modificati ons issued by rdso/camtech/icf from time to time shall be binding on the supplier without addition al cost implications. 3.tenderer to quote all inclusive cost in the columns created for maintenance schedules for 6 years (year1 means -27 month schedule, year2 means 36 months (ss2), year 3 means 45 months ,year 4 means 54 months(ss1), year 5 means 63 months and year 6 means 72 m onths (ss3)) as per details in the annexure attached .note:-year 1 will be counted from date of commissio ning of the respective rake and in case 27th month schedule falls within warranty period, no payment w ill be paid for year 1. 4. quantity in set mentioned in the unit column is for rake set only [ warranty period: 2 years, amc period: 6 years, rate of discounting: 10 % ] ]. Last date of submission for this tender is 2026-06-12. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free