Integral Coach Factory
- AOC value
- ₹1.3L
- AOC date
- 29 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 29 Mar 25AOC date
- -Published
- -Closes
- -Bid opens
- 29 Mar 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 29/03/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Bellows For Covering Screw Rod Top Side Of Coach Lifting Jacks Hydropack Make.Bellows For Covering Screw Rod Top Side Of Coach Lifting Jacks Hydropack Make.,Bellows For Covering Screw Rod Top Side Of Coach Lifting Jacks Hydropack Mak E. Type: Square With Split And Velcro, Mounting Type: Ms-Flange Split Type For Both Ends, Bellow Size: 175M M, Expanded Length: 2300Mm, Closed Length: 350Mm, No Of Folding: 40, Material: Pu - 0.50Mm, Mounting Plates: 2Mm (Ms/Ss), Mounting Plates Coating: Painting/Powder Coated. [ Warranty Period: 30 Months Aft Er The Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2025-02-21. This is a Railway Ancillaries tender in chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free