Integral Coach Factory
- AOC value
- ₹2.61Cr
- AOC date
- 24 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 24 Nov 25AOC date
- -Published
- -Closes
- -Bid opens
- 24 Nov 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 24/11/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Under Frame Complete (Lscn)Under Frame Complete (Lscn),Under Frame Complete For Lscn Shells To Drg. No. 73911001, Alt J,Col.I-1 No. The Firm Sh All Fulfill The Manufacturing Facility Requirement As Per Icf/Md/Spec-147, Issue Status 01, Rev-02 Wit H Amendment.01 Special Condition : Necessary Care Is To Be Taken That The Twist On The Under Frame A Nd Variation On Diagonals Are To Be Within 2Mm. Packing Condition As Per Drg.No. Icf/J&T/Misc-2487, Alt B. The Underframe Should Be Supplied As Normal Side Up And Side Bearer Side Down. [Safety Ite M]. [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lac S ] ]. Last date of submission for this tender is 2025-08-08. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free