Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of S & I Of Light Weight Pre Insulated Ac Duct For Vb Trainsets & I Of Light Weight Pre Insulated Ac Duct For Vb Trainset,Supply And Installation Of Light Weight Pre-Insulated Ac Duct For Vb Train Set Coaches -20 Car Formation For Dtc Coaches (Ref Drg. Ts/Dtc-44-001 Ait B), Mc/Ndtc Coaches (Ref:Drg.Train18/Mc/Ac-44 -Oo3 Alt C), Tc Coaches (Ref Drg. Train18/Tc/Ac-44-Oo3 Alt C). Material Of Construction Is Fibre Reinforc Ed Cured Board As Per Annexure -Ts-Ae Prototype Basis. One Set Consists Of Dtc- 2 C/S, Mc/Ndmc - 13 C/S, Tc/Hrp- 5 C/S. [ Warranty Period: 30 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2025-09-03. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
Unlock the Tender details for free

