Integral Coach Factory
- AOC value
- ₹107.75Cr
- AOC date
- 22 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 22 Aug 24AOC date
- -Published
- -Closes
- -Bid opens
- 22 Aug 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 22/08/2024
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply And Testing Of Semi-Auto Coupler For Train Set, Design, Manufacturing, Supply And Installation Of High Capacity Semi-Automatic Coupler With Type- 10 Head As Per Rdso Spec. Rdso / 2017 / Cg-07 With Automatic Coupling / Manual Uncoupling And Without Crash Buffers, Anti-Climbers, Pneumatic Connections & Electrical Connections, To Be Fitted In Pocket To Rcf Drawing Le1 1165 Without Modification. Special Condition : Irreversible Stroke Of Coupler Should Not Activ Ate At Shunting Speed Upto 10Kmph. -Installation Required Annexure-A Dated 13.09.2023 T O Be Followed. -Tenderer To Quote Rate For Supply And Installation Separately. [ Safety Item ] [ Warranty Period: 84 Months After The Date Of Delivery ] , Design, Manufacturing, Supply And Installation Of High Capacity Semi-Automatic Coupler With Type- 10 Head As Per Rdso Spec. Rdso / 2017 / Cg-07 With Automatic Coupling / Manual Uncoupling And Without Crash Buffers, Anti-Climbers, Pneumatic Connections & Electrical Connections, To Be Fitted In Pocket To Rcf Drawing Le1 1165 Without Modification. Special Condition : Irreversible Stroke Of Coupler Should Not Activ Ate At Shunting Speed Upto 10Kmph. -Installation Required Annexure-A Dated 13.09.2023 T O Be Followed. -Tenderer To Quote Rate For Supply And Installation Separately. [ Safety Item ] [ Warranty Period: 84 Months After The Date Of Delivery ] , Design, Manufacturing, Supply And Installation Of High Capacity Semi-Automatic Coupler With Type- 10 Head As Per Rdso Spec. Rdso / 2017 / Cg-07 With Automatic Coupling / Manual Uncoupling And Without Crash Buffers, Anti-Climbers, Pneumatic Connections & Electrical Connections, To Be Fitted In Pocket To Rcf Drawing Le1 1165 Without Modification. Special Condition : Irreversible Stroke Of Coupler Should Not Activ Ate At Shunting Speed Upto 10Kmph. -Installation Required Annexure-A Dated 13.09.2023 T O Be Followed. -Tenderer To Quote Rate For Supply And Installation Separately. [ Safety Item ] [ Warranty Period: 84 Months After The Date Of Delivery ] . Last date of submission for this tender is 2024-05-15. This is a Railway Ancillaries tender in chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free