Integral Coach Factory
- AOC value
- ₹73.72L
- AOC date
- 18 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 18 Nov 25AOC date
- -Published
- -Closes
- -Bid opens
- 18 Nov 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 18/11/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Side Wall Assembly Train 18 Tcside Wall Assembly Train 18 Tc,One Coach Set Of Side Wall Assembly And Door Cut Out Assy For Train Set Tr Ailer Coaches To Drg.Nos. 1) Sidewall To Drg No. 89114001, Alt C -1 No. Welding Parts An D Conduits To Drg. Nos. 89114010, Altg 89114011, Altg 72714027, Altf And 72714029, Alt F Should Be Assembled On Side Wall While Supplying. 2) Door Cut Out To Drg. Nos. 726140 09, Alt #S# # 2 Nos And 72614010, Alt #R# # 2 Nos. To Be Supplied In Coach Sets. The Firm Sh All Fulfill The Requirement As Per Icf/Md/Specn-200, Isssue Status -01. Rev-04, Amendment No-01 Special Condition : Packing Condition To Be As Per Drg Icf/J&T/Misc-2988, Alt Nil Icf/J& T/Sk-1871, Alt Nil. [Safety Item] I [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]. Last date of submission for this tender is 2025-11-10. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free