Integral Coach Factory
- AOC value
- ₹6.92L
- AOC date
- 17 Apr
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 17 Apr 24AOC date
- -Published
- -Closes
- -Bid opens
- 17 Apr 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 17/04/2024
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Straight Connector Nw17 Dia 20Mmstraight Connector Nw17 Dia 20Mm,Straight Connector Fittings To Connect Flexible Corrugated Conduit Nw 17 And Rigid Metal Conduits Dia 20 Mm With Clamps To Spec.No.Rdso/Pe/Spec/Ac/ 0138-2009, Rev-1, Annexure-A, A14 Sl.No-1. Please Visit Icf Vendor Portal For Downloading Drawing Https://Vp.Icf.Go V.In/Vendtendordetnew.Php Using Key : 0824R012mlb1038 [ Warranty Period: 30 Months After The Date Of Deli Very ]. Last date of submission for this tender is 2024-04-10. This is a Clamps tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free