Integral Coach Factory
- AOC value
- ₹1.21Cr
- AOC date
- 18 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 18 Dec 24AOC date
- -Published
- -Closes
- -Bid opens
- 18 Dec 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 18/12/2024
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of S & I Of Frp Panel In Emu Coachess & I Of Frp Panel In Emu Coaches,Supply And Installation Of Frp Side Wall Panel / End Wall Panel For Emu/3Ph Coaches To Drg. No.Emu/C/Hc Er-4-2-001,Col-I,Alt-Nil, Items - 1 To 5 & 11,Frp Partition Panel To Drg.No.Emu/C/Hc/Er-4-3-001, Col-I, Alt- Nil, Item-6,Frp Roof Panel To Drg.No.Emu/C/Hc/Er- 4-4-001, Col-I, Alt- E (Except Item-1) And Specn. For Frp Panel Shall Be As Per Icf/Md/Spec - 1 67A, Issue Status, Rev-05 With Amd-01 To 04.Please Visit Icf Vendor Portal For Downloading Drawin G Https://Vp.Icf.Gov.In/Vendtendordetnew.Php Using Key: 072499Zxfjf2609. [ Warranty Period: 30 M Onths After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] Furnishing Depot/Icf,Chennai, Tamil Nadu 82.00 Set. Last date of submission for this tender is 2024-11-13. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free