Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of coach set of lavatory sidewall (lhb ac pp) , one coach set of lavatory sidewall for amrit bharat air conditioned to drg nos 1) 8291 4006, alt nil -1 no 2) 82914007, alt nil -1 no 3) 82914008, alt nil -1 no 4) 82914009, alt nil -1 no the firm shall fulfil the requirement as per icf/md/specn.200, issue status -01,rev.04 wit h amendment no.- 1 special condition : to be supplied in coach set. packing drawing as per icf/ j&t/sk-1802, alt nil [safety item] [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-07-03. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

