Integral Coach Factory
- AOC value
- ₹4.4L
- AOC date
- 5 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 5 Aug 26AOC date
- -Published
- -Closes
- -Bid opens
- 5 Aug 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 05/08/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of straight connector nw17 dia 20mm , straight connector fittings to connect flexible corrugated conduit nw 1 7 and rigid metal conduits dia 20 mm with clamps to spec.no.rdso/pe/spec/ac/ 0138- 2009, rev-1, annexure-a, a14 sl.no-1. [ warranty period: 30 months after the date of delivery ] ]. Last date of submission for this tender is 2026-04-03. This is a Clamps tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free