Integral Coach Factory
- AOC value
- ₹42.04L
- AOC date
- 8 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 8 Nov 25AOC date
- -Published
- -Closes
- -Bid opens
- 8 Nov 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 08/11/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of S&I Offrp Paneling With Fixing Requirements For Side Wall, End Wall, Partition And Roof Of Emu/3Ph Coachess&I Offrp Paneling With Fixing Requirements For Side Wall, End Wall, Partition And Roof Of Emu/3Ph Coaches,S&I Of Frp Paneling With Fixing Requirements For Side Wall, End Wall, Partition And Roof Of Emu/3Ph Coaches To Specn. No. Icf/Md/Spec-167A, Rev-05 With Amd-01 To 04 And General Arrangement And Dimensions To Drg. Nos. Emu/M/3Ph-4-2-001, Col-I, Alt- Nil, (Items 1 To 6), Emu/M/3Ph-4-3-001, Alt-Nil, Item-2 And 5,Icf/Mrvc/M/Bt4-4-006, Col-I, (Excep T Item-1) Alt-K. [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] Furnishing Depot/Icf,Chennai, Tamil Nadu 8.00 Set. Last date of submission for this tender is 2025-11-04. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free