Integral Coach Factory
- AOC value
- ₹1.1Cr
- AOC date
- 1 May
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 1 May 26AOC date
- -Published
- -Closes
- -Bid opens
- 1 May 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 01/05/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of foot step assembly s.s lhb , stainless steel foot step assembly for lhb coaches to drg. no. (581)lgs/eo g-2-4-004, col-1, alt a - 1 no. special condition : 1. item shall be stacked one over the other, secure d using packing strip and placed in steel pallet. 2. the height of each stack shall not exceed 750mm f or easy handling. 3. suitable and sufficient packing strips to be used such that stacked items do not di sintegrate during transit, storage and handling. [safety item] [ warranty period: 30 months after t he date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-04-06. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free