Integral Coach Factory
- AOC value
- ₹51.54L
- AOC date
- 17 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 17 Mar 26AOC date
- -Published
- -Closes
- -Bid opens
- 17 Mar 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 17/03/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of C/S Of End Wall (Emu C, Chc)C/S Of End Wall (Emu C, Chc),One Coach Set Of Stainless Steel Endwall For 3 Phase Ac Emu Trailer C Coa Ch To Drg. No. (616)Emu/C/3Ph-1-5-001/Col.I Alt F - 1 No (616)Emu/C/3Ph-1-5-002/Col.I Alt D - 1 No. Firm Shall Fulfil The Manufacturing Facility As Per Icf/Md/Spec-315,Issue Status-01, Rev.00 Special Condition : Packing As Per Icf/J&T/Sk-1777, Alt A. There May Be Minor Modifica Tion In The Drawing. Firm May Be Advised To Confirm The Final Drawing Before Manufact Uring. [Safety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]. Last date of submission for this tender is 2026-01-22. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free