Integral Coach Factory
- AOC value
- ₹39.33L
- AOC date
- 9 Jul
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 9 Jul 24AOC date
- -Published
- -Closes
- -Bid opens
- 9 Jul 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 09/07/2024
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of ss Roof And Side Wall For 3 Phase Ac Emu,One Coach Set Of Stainless Steel Roof And Side Wall For 3 Phase Ac Emu M Otor Coaches (M, M2, M3 - Bt) To Drg.Nos.77016001 Col-I Alt A - 1 No, 57414001 Alt D Col I - 1 No And Col Ii - 1 No. (Without Forced Air Circulation) Firm Shall Fulfill The Requirement As Per Icf/Md/Spec-200, Issue Status-01, Rev-04 With Amendment No 1. Special Condition : Packin G Condition As Per Latest Alteration Of Icf/J&T/Misc-2402 Alt B. [Safety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] => Limited. Last date of submission for this tender is 2024-06-11. This is a Railway Ancillaries tender in chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free