Integral Coach Factory
- AOC value
- ₹15.86L
- AOC date
- 9 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 9 Dec 25AOC date
- -Published
- -Closes
- -Bid opens
- 9 Dec 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 09/12/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of C/S Of End Wall (Emu Tc)C/S Of End Wall (Emu Tc),One Coach Set Of End Wall For Ac Emu Trailor Coaches With Automatic Door For Central R Ailway To Drg No (A41)Emu/Tc/Ad-1-5-001 000 01 Alt Nil- 1 No And (A41)Emu/Tc/Ad-1-5-002 000 01 Alt Nil- 1 No. Firm Shall Fulfil The Manufacturing Facility As Per Icf/Md/Spec-315. Issue Sta Tus-01, Rev.00. Special Condition : Packing As Per Icf/J&T/Sk-1809 Alt A There May Be Minor M Odification In The Drawing. Firm Is Advised To Confirm The Final Drawing Before Manufa Cturing. [Safety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ] => Limited. Last date of submission for this tender is 2025-11-21. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free