Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of s & i body side sliding door (emu & memu) , body side sliding door to drg.no.icf/mrvc/c/bt-5-8-001,alt e col.i. special condition : 1.lea ves with top guide rails shall be supplied to furnishing depot (for fitment after painting of shell). 2.installation required annexure - a, dtd 13-09-2023 to be followed. 3. supply rate and installation rate to be quoted seperately. 4. packing drawing icf/j&t/sk-1866, alt nil, similar packing drg. to be used f or sliding door packing. rust prevention precautions to be followed for during storage. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s ] ]. Last date of submission for this tender is 2026-07-27. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

