Integral Coach Factory
- AOC value
- ₹5.38L
- AOC date
- 3 Dec
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 3 Dec 22AOC date
- -Published
- -Closes
- -Bid opens
- 3 Dec 2022AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 03/12/2022
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Tube Clamp Fit To Conduit Size Nw36 ( Dia 40 Mm ) Tube Clamp Fit To Conduit Size Nw36 ( Dia 40 Mm ) , Tube Clamp Fit To Conduit Size Nw36 ( Dia 40 Mm ) , Clamp Shall Meet All Technical Requirements Specified In Annx-A, Tab-A8, S.No.7 Of Spec. No. Rdso / Pe / Spec / Ac / 0138-2009, Rev.1 Please Visit Icf Vendor Portal For Downloading Drawing Http: / / Vp.Icf.Gov.In / Vendtendordetnew.Php Using Key : 06229S5mgkz2068 => Limited. Last date of submission for this tender is 2022-11-18. This is a Clamps tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free