Integral Coach Factory
- AOC value
- ₹18.22L
- AOC date
- 5 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 5 Nov 26AOC date
- -Published
- -Closes
- -Bid opens
- 5 Nov 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 05/11/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of under frame (emu c hc) , under frame arrgt for emu c to drg no.(573)icf/mrvc/c/bt-1-1-001, alt k col 2. firm shall fulfil the manufacturing facility as per icf/md/spec-147, issue status-01 rev .02 with amendment no.02. special condition : the under frame should be supplied as norm al side up and side bearer side down. packing condition as per drg no. icf/j&t/misc-2487, alt b note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surf ace of cross members shall be ensured before welding the trough floor with cross members to avoid b i-metallic corrossion.[safety item] [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-10-07. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free