Integral Coach Factory
- AOC value
- ₹3.38Cr
- AOC date
- 24 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 24 Nov 23AOC date
- -Published
- -Closes
- -Bid opens
- 24 Nov 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 24/11/2023
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Shell Kit Item For Lhb Lwscnshell Kit Item For Lhb Lwscn,Shell Kit Item For Lhb Lwscn Coaches A) One Coach Set Of Roof And 3Mm Side Wall (Bus Type Window) To Drg. No. 1) Roof Complete To Drg.No.74316001, Col-I, Alt Nil - 1 No To Be Supplied With Welding Pin To Drg. No.58210045, Alt Nil - 1 No 2) Side Wall Complete To Drg.No.74314024, Alt Nil - 1 No The Firm Shall Fulfil The Requirement As Per Icf/Md/Specn.200, Rev.04 With Amendment No.- 1 B) End Wall Complete To Drg No: 74115001, Alt C, Col-I - 2 Nos C) Partition Frames And Body Shell Items 1. Partition Frames To Drg.No.58210070, Alt A - 1 No. 2. Rain Water Gutter To Drg.No.Aaa10488, Alt C -4 Nos. 3. Supporting Member On Trough Floor To Drg.No.58210015, Alt `G - 1 No. 4. Water Tank Ceiling Construction To Drg.No.58210036, Alt `A - 2 Nos. 5. Support To Drg.No.Aaa10913, Alt Nil - 2 Nos. 6. Bracket Complete For Mounting Dummy To Drg.No.58110017, Alt B - 2 Nos. 7. Chair Pillar To Drg.No.58210044, Alt E - 1 No. 8. Bracket Complete L.H To Drg.No.-58110015, Alt A - 6 Nos. 9. Bracket Complete R.H To Drg.No.- 58110016, Alt A - 3 Nos. 10. Angle To Drg.No.Aab10338, Alt Nil - 16 Nos 11. Water Tank Ceiling Construction Roof Support To Drg. No. 67010011, Alta - 2 Nos. 12. Step Complete Mounting To Drg.No.Lgs/Eog-2-4-004, Alt Nil - 4 Nos. 13. Exterior Garniture To Drg.No.Lwscwac/Eog-2-6-001, Alt H, Col.I - 1 No. D) Supply And Installation Body Side Entrance Door To.Drg. No. Lscn/Eog-5-2-001, Alt Nil, Col.I - 1 No. E) Under Frame Complete To Drg.No.73911001, Alt F- 1 No The Manufacturing Facility As Per Icf/Md/Specn.147, Issue Status 01, Rev.02,With Amendment No.1. Special Condition : A) - Packing As Per Icf/J&T/Misc- 2201, Alt E. And Safety Instruction As Per Icf/J&T/Sk-1867, Alt. Nil. B) -Packing As Per Drg.Icf/J&T/Sk-1809, Alt A C) -Packing Condition As Per Icf/J&T/Sk-1865. D) 1) Installation Required As Per Assy Drg & Annexure-A To Be Followed. 2) Supply Rates And Installation Rates To Be Quoted Sepa. Last date of submission for this tender is 2023-11-08. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free