Integral Coach Factory
- AOC value
- ₹97.97L
- AOC date
- 18 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 18 Sep 25AOC date
- -Published
- -Closes
- -Bid opens
- 18 Sep 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 18/09/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Coach Set Of Stainless Steel Roof And Side Wallcoach Set Of Stainless Steel Roof And Side Wall,One Coach Set Of Stainless Steel Roof And Side Wall For 3 Phase Ac Emu Mot Or Coaches (617) And (621) To Drg. Nos. Emu/M/3Ph-1-6-001/Col.I Alt E - 1 No. Emu/M/3Ph-1- 4-001/Col.I Alt A - 1 No. Emu/M/3Ph-1-4-001/Col.Ii Alt A - 1 No. The Firm Shall Fulfil The R Equirement To Specn Icf/Md/Specn.200, Issue Status 01, Rev.04, Amendment-01. Special Condit Ion : -Loose Item Of Air Duct Supplied Must Be Assembled By The Firm At Icf And Annexure A Dt. 13/09/2023 To Be Followed. -Packing Condition As Per Icf/J&T/Misc -2402, Alt B. [Safety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]. Last date of submission for this tender is 2025-08-29. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free