🎉 Your free trial plan has started. Plan will expire in 0 days

Integral Coach Factory

chennai, tamil nadu

AOC value
₹25.18K
AOC date
6 Apr
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 6 Apr 26AOC date

Important info

Result ID
Refer Docs
Award of contract
06/04/2026
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Integral Coach Factory has published Supply Of Pu Bush (Yellow Colour) Od 65Mm,Id 17.5Mm, Length 100Mmpu Bush (Yellow Colour) Od 65Mm,Id 17.5Mm, Length 100Mm,Pu Bush (Yellow Colour) Od 65Mm,Id 17.5Mm, Length 100Mm. Note: 1. Visual Inspecti On . Surface Finish: Inspect For Cracks, Pits, Or Air Bubbles (Voids) Which Can Lead To Premature Failure Under Compression. . Edges: Ensure Clean-Cut Edges Without Fraying Or Burrs That Could Interfere With The Punch M Ovement. 2. Dimensional Verification Use Calibrated Digital Vernier Calipers Or Micrometers To Check Against The Design Specifications: . Inner Diameter (Id): Must Allow A Snug Fit Over The Punch Without Binding. . Oute R Diameter (Od): Should Fit The Housing/Pocket Correctly To Allow For Natural Bulging During Compression. . L Ength/Height: Consistency Across A Batch Is Critical For Uniform Stripping Force. 3. Mechanical & Material Tes Ting . Hardness Test: Use A Shore A Durometer. Acceptance Typically Requires A Reading Of 90 Shore A (+/_5 ) For Standard Industrial Punch Strippers. . Compression/Permanent Set: . Compress The Bush To Its Maximu M Recommended Stroke (Typically 25%-30%) For A Set Duration. . Acceptance Criteria: After Releasing The Lo Ad, The Bush Should Return To Its Original Height. A Permanent Set (Creep) Of More Than 5%-8% After Initial C Ycles May Be Cause For Rejection. . Stiffness Variation: The Percentage Variation In Stiffness Before And After Test Cycles Should Generally Remain Within 20% Of The Original Value. 4. Advanced Verification (Batch Accept Ance) . Oil & Chemical Resistance: For High-Volume Production, Submerge A Sample In The Lubricant Used In The Press For 24 Hours. The Material Should Not Swell Or Become Brittle. [ Warranty Period: 30 Months Aft Er The Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2026-03-03. This is a Railway Ancillaries tender in Chennai, Tamil Nadu

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in