Integral Coach Factory
- AOC value
- ₹2.27Cr
- AOC date
- 17 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 17 Sep 26AOC date
- -Published
- -Closes
- -Bid opens
- 17 Sep 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 17/09/2026
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of sni of retention tank , retention tank with s-trap arrangement to drg. no. dmu/tc/ss-6-3-012, col-1 , alt- e, and as per specn. icf/md/spec-254, issue status-01, rev-02 with amd. 01 (except ma terial deviation list). [ warranty period: 36 months after the date of delivery ] ] , retention tank with s-trap & without pressurised flushing for lwlrrm coa ches to drg.no.mi006418, alt-c, anx-1 and as per specn. mdts-26001, rev-04(except clause 3.5 -pressurised flushing system) for special terms and condition for procurement of r etention tank system for lhb coaches. [ warranty period: 84 months after the date of deliver y ] ]. Last date of submission for this tender is 2026-08-13. This is a Water Tank tender in Chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free