Integral Coach Factory
- AOC value
- ₹37.63L
- AOC date
- 21 Feb
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 21 Feb 25AOC date
- -Published
- -Closes
- -Bid opens
- 21 Feb 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 21/02/2025
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Ss End Wallss End Wall,One Coach Set Of Stainless Steel End Wall (Alarm End And Cab End) For Stain Less Steel M & M2 Coaches (Mrvc Phase-Ii) To Drg.Nos. End Construction-Alarm End To D Rg.No. Icf/Mrvc/M/Bt-1-5-001 Alt L Col.I-1No. End Construction - Cab End To Drg.No. Icf/Mr Vc/M/Bt-1-5-002 Alt H Col-I- 1 No. Special Condition : Packing As Per Icf/J&T/Sk-1777, Alt A. [Sa Fety Item] [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ] => Limited. Last date of submission for this tender is 2025-02-04. This is a Railway Ancillaries tender in chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free