🎉 Your free trial plan has started. Plan will expire in 0 days

Integral Coach Factory

chennai, tamil nadu

AOC value
₹1.85Cr
AOC date
4 Sep
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 4 Sep 26AOC date

Important info

Result ID
Refer Docs
Award of contract
04/09/2026
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Integral Coach Factory has published Supply Of shell kit (memu tc jk) , shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt nil - 1 no. location of sidewall 94514001 000 01 alt nil - 1 no. end construction pail end 94515001 000 01 alt a - 1 no. end construction non pail end 94515002 000 01 alt nil - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill the manufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.suppl y of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 9 4410076 000 01 alt nil - 2 nos. 2. 94510007 000 01 alt b - 1 no. 3. 94510002 000 01 alt a - 1 no. 4. 9441007 2 000 01 alt nil - 2 nos. 5. 94410054 000 01 alt nil - 4 nos. c. under frame arrangement 94211001 000 01 alt nil - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt f. packing as per icf/j&t/ sk-1809, alt a. packing condition as per drg.no.icf/j&t/misc-2487, alt b the underframe should be s upplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt a. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front p art with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) tres tle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complet e welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheet s. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation an d painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspe ction. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revisi on on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid b i-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s ] ]. Last date of submission for this tender is 2026-06-04. This is a Railway Ancillaries tender in Chennai, Tamil Nadu

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in