Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of end wall (lwaccn pp, lwaccw pp & lwfac pp) , end wall for laccn /pp2.2 (829)laccw /pp2.2 (828) and lwfac /pp2.2 (827) shells to d rg no.82815001 col-i alt b - 1no the firm shall fulfil the requirement as per icf/md/spec-3 15,issue status-01, rev.00, amendment-01. special condition : packing as per drg. icf/j&t/sk-1 809, alt a.[safety-item] [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-07-16. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

