Integral Coach Factory
- AOC value
- ₹39.36L
- AOC date
- 25 Apr
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 25 Apr 24AOC date
- -Published
- -Closes
- -Bid opens
- 25 Apr 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 25/04/2024
- Authority
- Integral Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Integral Coach Factory has published Supply Of Coach Set Of Longitudinal Beam Stiffener Assembly (Crf)Coach Set Of Longitudinal Beam Stiffener Assembly (Crf),One Coach Set Of Longitudinal Beam Stiffener Assembly (Crf) For Air Cond Itioned Emu Coaches To Drg.No.Emu/Dmc/Ac-1-1-023/Col-I, Col-Ii,Col-Iii & Col-Iv Alt Nil Ea Ch One Number. Special Condition : Packing As Per Icf/J&T/Sk-1779 Alt A. [ Warranty Period: 30 M Onths After The Date Of Delivery ] => Limited. Last date of submission for this tender is 2024-07-05. This is a Railway Ancillaries tender in chennai, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free