Heavey Water Board
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Authority
- Heavey Water Board
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Heavey Water Board has published In Service Inspection Of Plant Equipments And Pipelines - Visual Examination . Thorough Examination Of The Entire Euipment / Pipeline Loop Including Body, Nozzle, Studs, Washer & Supports As Instructed By The Engineer In-Charge For Any Dimensional Variation, Visual Crack, Surface Condition, Viz. Errosion , Corrosion Etc. Job Include Removal Of Insulation For Inspection — 2 Hardness Measurement - Thorough Grinding & Cleaning Of The Surface, Lnsulation Removal ( If Any ) Prior To Performing The Test. Non-Denting Equipment Should Be Used And Hardness Should Be Taken At Four Diametrically Opposite Points In Case Of Pipelines. Job Include Removal Of Insulation For Inspection , 3 Ultrasonic Thickness Measurement. Tho Rough Grinding & Cleaning Of The Surface, Insulation Removal ( If Any ) Pnor To Performing The Test. Thickness Should Be Taken At Four Diametrically Opposite Points In Case Of A Pipeline Using Normal Probe With A Proper Record Of The Results Including Percentage Reduction In The Thickness Job Include Removal Of Insulation For Carrvino Out The Test. , 4 Ultrasonic Weld Examination In Haz Of Weld ( Including Upto 1 / 2” From Weld Boundary ) . Thorough Grinding & Cleaning Of The Surface, Insulation Removal ( If Any ) Prior To Performing The Test Generation Of Dac Cureve, Proper Recording Of The Graph &Values During The Test Job Include Removal Of Insulation For Inspection , 5 Visual Dye Penetrant Examination Of The Welds ( Including Upto 1 / 2” From Weld Boundary ) , Bends Etc. By Cleaning The Area Using Grinding / Buffing / Emery Depending On The Surface Condition And As Instructed By The Engineer In-Charge. Job Include Removal Of Insulation For Inspection 6 Ln-Situ Replica / Microstructure Examination Without Sem Job May Include Removal Of Insulation For Inspection 7 Radiography - Job Involves Making Necessayy Arrangements & Executing The Iob For Carrying Out Radiography Of Pipeline Weld Joints. 8 Lmpact Testing Of Samples At -45 Deg C Including Machining Of Samples. Last date of submission for this tender is 2022-10-13. This is a Bolts tender in Tuticorin, Tamil Nadu
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
2 issued- Tender Document 1pdfPDF document
- Tender Document 2htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free