West Central Railway
- AOC value
- ₹39.64L
- AOC date
- 3 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 3 Mar 26AOC date
- -Published
- -Closes
- -Bid opens
- 3 Mar 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 03/03/2026
- Authority
- West Central Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
West Central Railway has published Supply Of Supply, Installation, Testing & Commissioning Of 2-Ton Spilt Ac And Other Itemssupply, Installation, Testing & Commissioning Of 2-Ton Spilt Ac And Other Items,Installation Of Copper Tube Pipe Line 5/8+ 3/8 Copper Tube With Insulation Sleeve With 4 Core C Opper Cable 1.5 Sq.Mm For Split Ac. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply Of Copper Tube Pipe Line 5/8+ 3/8 Copper Tube With Insulation Sleeve With 4 Core Cop Per Cable 1.5 Sq.Mm For Split Ac. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply And Fixing Of Metal Clad Plug And Socket Box With 1 Pole Mcb 20/25 Amp, 250 Volt [ W Arranty Period: 30 Months After The Date Of Delivery ] ] , Supply & Fixing Of Mcb Distribution Board Double Door Wall Mounted Having Mccb 100 Amp T Pn On Incoming & 12 Nos Mcb Sp 06-32 Amp Braking Capacity 10 Ka, On Outgoing Connected Through Busba R & Equally Distributed On 3- Phase Complete With Connection. Make- . Make List Attached [ Warranty Perio D: 30 Months After The Date Of Delivery ] ] , Supply And Fixing Of L Type Wall Mounted Stand For Outdoor Split Ac Units. [ Warranty Perio D: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing & Commissioning Of 2-Ton Spilt Ac As Per Explanatory Notes. Ma Ke- Amtrex, Blue Star, Carrier, Fedders Lloyd, Frick, Shriram, Videocon, Voltas, Air Con, Lg, Hi Tachi, Samsung Or Similar. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply Of 5.0 Kva Automatic Line Voltage Stabilizer. Make- Bhel, Hind Rectifier, L&T, Ngef, Siemens, Usha Rectifier, Delta, Servocone. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply And Fixing Of Ppr Drain Pipe (1 In Main Line & ?? In Branch Line) Concealed In Wall Com Plete With All Accessories Like T, Elbow, Socket Etc.. [ Warranty Period: 30 Months After The Date Of Delive Ry ] ] , Supply & Fixing Of 4 Poles On Load Changeover Switch In Steel Sheet Enclosure, Rating-400 A Mps., 415V, 50Hz, Confirming To Is. Last date of submission for this tender is 2026-01-21. This is a Air Conditioner tender in Kota, Rajasthan
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free