🎉 Your free trial plan has started. Plan will expire in 0 days

West Central Railway

kota, rajasthan

AOC value
₹39.64L
AOC date
3 Mar
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 3 Mar 26AOC date

Important info

Result ID
Refer Docs
Award of contract
03/03/2026
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

West Central Railway has published Supply Of Supply, Installation, Testing & Commissioning Of 2-Ton Spilt Ac And Other Itemssupply, Installation, Testing & Commissioning Of 2-Ton Spilt Ac And Other Items,Installation Of Copper Tube Pipe Line 5/8+ 3/8 Copper Tube With Insulation Sleeve With 4 Core C Opper Cable 1.5 Sq.Mm For Split Ac. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply Of Copper Tube Pipe Line 5/8+ 3/8 Copper Tube With Insulation Sleeve With 4 Core Cop Per Cable 1.5 Sq.Mm For Split Ac. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply And Fixing Of Metal Clad Plug And Socket Box With 1 Pole Mcb 20/25 Amp, 250 Volt [ W Arranty Period: 30 Months After The Date Of Delivery ] ] , Supply & Fixing Of Mcb Distribution Board Double Door Wall Mounted Having Mccb 100 Amp T Pn On Incoming & 12 Nos Mcb Sp 06-32 Amp Braking Capacity 10 Ka, On Outgoing Connected Through Busba R & Equally Distributed On 3- Phase Complete With Connection. Make- . Make List Attached [ Warranty Perio D: 30 Months After The Date Of Delivery ] ] , Supply And Fixing Of L Type Wall Mounted Stand For Outdoor Split Ac Units. [ Warranty Perio D: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing & Commissioning Of 2-Ton Spilt Ac As Per Explanatory Notes. Ma Ke- Amtrex, Blue Star, Carrier, Fedders Lloyd, Frick, Shriram, Videocon, Voltas, Air Con, Lg, Hi Tachi, Samsung Or Similar. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply Of 5.0 Kva Automatic Line Voltage Stabilizer. Make- Bhel, Hind Rectifier, L&T, Ngef, Siemens, Usha Rectifier, Delta, Servocone. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply And Fixing Of Ppr Drain Pipe (1 In Main Line & ?? In Branch Line) Concealed In Wall Com Plete With All Accessories Like T, Elbow, Socket Etc.. [ Warranty Period: 30 Months After The Date Of Delive Ry ] ] , Supply & Fixing Of 4 Poles On Load Changeover Switch In Steel Sheet Enclosure, Rating-400 A Mps., 415V, 50Hz, Confirming To Is. Last date of submission for this tender is 2026-01-21. This is a Air Conditioner tender in Kota, Rajasthan

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in