West Central Railway
- AOC value
- ₹9.87L
- AOC date
- 6 Apr
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 6 Apr 26AOC date
- -Published
- -Closes
- -Bid opens
- 6 Apr 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 06/04/2026
- Authority
- West Central Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
West Central Railway has published Supply Of ac and ac item , installation of copper tube pipe line (2 tubes) with insulation sleeve with 4 core copper cable 2.5 sq.mm for split ac.make-rpg,unifex,havells,anchor,rr cables,leader,unistar,finolex,asian,kel,hpl,polycab. [ warranty period: 30 months after the date of delivery ] ] , supply of copper cable 2.5 sqmm 4 core for split ac. make-rpg,unifex,havells,anchor, rr cables,leader,unistar,finolex,asian,kel,hpl,polycab [ warranty period: 30 months after the d ate of delivery ] ] , supply,installation,testing&commissioning of copper tubes gas and liquid line, proper insulat ion and copper communication cable between indoor and outdoor ac units, copper cable between outdo or to electricity point with proper drainage and with suitable hall in wall for 4-ton, inverter floor standing tower air conditioner. ] , supply of copper tube pipe line 1/2 for split ac. [ warranty period: 30 months after the d ate of delivery ] ] , supply and installation of 5 kva single phase stabilizer for split ac 1.5 ton & 2 ton. as per a ttached details specification.make- bhel, hind rectifier, l&t, ngef, siemens, usha rectifier, delta, s ervocone or similar. [ warranty period: 30 months after the date of delivery ] ] , supply and installation of 10 kva single phase stabilizer for tower ac 4 ton. as per attached details specification.make- bhel, hind rectifier, l&t, ngef, siemens, usha rectifier, delta, servoc one or similar. [ warranty period: 30 months after the date of delivery ] ] , supply, of 4-ton, 3 star inverter floor standing tower air conditioner as per attached techni cal specification. make- amtrex, blue star, carrier, fedders lloyd, frick, shriram, videocon, vol tas, , air con, lg, hitachi, samsung or similar. [ warranty period: 30 months after the date of deliver y ] ] , installation testing & commissioning of 4-ton, 3 star inverter floor standing tower air condit ioner as per attached details specification. [ warranty period: 30 months after the date of delivery ] ] , supply, installation ,testing & commissioning of 1.5 ton split ac 5 star rating inverter type. as per attached details specification. make- amtrex, blue star, carrier, fedders lloyd, frick, shrir am, videocon, voltas, , air con, lg, hitachi, samsung or similar. [ warranty period: 30 months afte r the date of delivery ] ] , supply and fixing of ppr drain pipe (1 in main line & 1/2 in branch line) concealed in wall co mplete with all accessories like t, elbow, socket etc. suitable for split ac 1.5 ton & 2 ton for installation o f ac units. ] , supply of copper tube pipe line 1/4 for split ac. [ warranty period: 30 months after the d ate of delivery ] ] , supply and installation of floor ms stand suitable for tower ac 4 ton & 2 ton indoor units a s per site requirement. ] , 3 inch hole in stone/bricks wall with pvc pipe fixing for air conditioner for installation of spli t ac units. ] , supply and fixing of ms angle fabricated stand suitable for 2 outdoor ac units as per site r equirement. ]. Last date of submission for this tender is 2026-03-19. This is a Air Conditioner tender in Kota, Rajasthan
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free