West Central Railway
- AOC value
- ₹2.92L
- AOC date
- 17 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 17 Sep 25AOC date
- -Published
- -Closes
- -Bid opens
- 17 Sep 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 17/09/2025
- Authority
- West Central Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
West Central Railway has published Supply Of (1) Auxiliary Reservoir Supporting Bracket. Drawing No. :- Contr-9405-S/15, Alt-10 Or Latest, Item No-14. (2) Supporting Bracket For Locking Bracket To Drg. No. Contr-9405-S/15,Alt.-10 Or Latest, Item-9. (3) Supporting Bracket For Fp As Per Drawing No. Contr-9405-S/15, Alt-10 Or Latest, Item No.23. (4) Locking Bracket. Drawing No. :-Contr-9405-S/15, Alt-10 Or Latest, Item No- 11. (5) Locking Bracket To Rdso Drg. No. Contr-9405-S/15, Alt-10 Or Latest, Item No. 22(1) Auxiliary Reservoir Supporting Bracket. Drawing No. :- Contr-9405-S/15, Alt-10 Or Latest, Item No-14. (2) Supporting Bracket For Locking Bracket To Drg. No. Contr-9405-S/15,Alt.-10 Or Latest, Item-9. (3) Supporting Bracket For Fp As Per Drawing No. Contr-9405-S/15, Alt-10 Or Latest, Item No.23. (4) Locking Bracket. Drawing No. :-Contr-9405-S/15, Alt-10 Or Latest, Item No- 11. (5) Locking Bracket To Rdso Drg. No. Contr-9405-S/15, Alt-10 Or Latest, Item No. 22,Auxiliary Reservoir Supporting Bracket. Drawing No. :- Contr-9405-S/15, Alt-10 Or La Test, Item No-14 [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supporting Bracket For Locking Bracket To Drg. No. Contr-9405-S/15,Alt.-10 Or Latest, Item- 9. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supporting Bracket For Fp As Per Drawing No. Contr-9405-S/15, Alt-10 Or Latest, Item No.23 [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Locking Bracket. Drawing No. :-Contr-9405-S/15, Alt-10 Or Latest, Item No- 11. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Locking Bracket To Rdso Drg. No. Contr-9405-S/15, Alt-10 Or Latest, Item No. 22 [ Warrant Y Period: 30 Months After The Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2025-09-09. This is a Railway Ancillaries tender in Kota, Rajasthan
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free