🎉 Your free trial plan has started. Plan will expire in 0 days

Nuclear Power Corporation Of India Limited

chittorgarh, rajasthan

AOC value
₹80.12L
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Nuclear Power Corporation Of India Limited has published Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1 Point 5 And 2 Ton Window Air Conditioners Operability Check On Monthly Basis Routine Service Once In Two Months Per Ac Attending Breakdown Or Deficie.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1 Point 5 By 2 Ton Split Air Conditioners Operability Check On Monthly Basis Routine Service Once In Two Months Per Ac Attending Breakdown Or Deficienci.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1X5 Ton By 2X5 Ton By 1X5 Point 5 Ton Package Air Conditioners Operability Check On Monthly Basis Routine Service Once In Two Months, Attending Breakdo.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 40 And 80 And 150 Litres Water Coolers Monthly Tank Cleaning Of Water Coolers Routine Service Once In Two Months Attending Breakdown Or Deficiencies Be.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Deep Freezers And Bottle Cooler And Vertical Freezers Operability Check On Monthly Basis Routine Service Once In Two Months Attending Breakdown Or Def.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 165 And 230 And 300 Litre Refrigerators Operability Check On Monthly Basis Routine Service Once In Two Months Attending Breakdown Or Deficiencies Being .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 11Tr Pacs In Switchyard Control Room Condition Monitoring On Daily Basis, Attending Breakdown Or Deficiencies Being Reported As And When Required Mainte.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Aqua Guard Water Filters Operability Check On Monthly Basis Routine Service Once In Two Months Attending Breakdown Or Deficiencies Being 1 Reported As And.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Hydrogen Coolers 1 Point 5 Ton Capacity Operability Check On Monthly Basis Routine Service Once In Two Months Attending Breakdown Or Deficiencies Being .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 3 Point 0 Ton Cassettes By Duct Able Model Air Conditioners Operability Check On Monthly Basis Routine Service Once In Two Months Per Ac Attending Bre.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Desert Coolers Breakdown Maintenance As And When Required And Maintenance Of Desert Coolers Once In A Year Including Painting Of Desert Cooler Body Ins.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Cellulose Pad Desert Coolers Breakdown Maintenance As And When Required And Maintenance Of Cellulose Pad Desert Coolers Once In A Year Including Painti.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Replacement Of Cellulose Pad Replacement Of Pad For Cellulose Pad Desert Coolers Detailed Scope Of Work Is Mentioned In Tender Document And Boq Attached.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Replacement Of Canvas Joint In Cellulose Pad Desert Coolers Replacement Of Canvas Joint In Cellulose Pad Desert Coolers Detailed Scope Of Work Is Menti.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Replacement Of High Quality Copper Tubing 1 By 4 And 1 By 2 And 3 By 4 And 5 By 8 In 1 Point 5 And 2 Point 0 Air Conditioners As And When Required Dur.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Replacement And Supply Of Complete Cellulose Pad Desert Cooler Body Size Of 1169 Mm H X 915 Mm W X 940 Mm L Any Deviation May Be Plus Minus 20 Mm And.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Replacement And Supply Of Desert Cooler Complete Body Size 902 Mm H X 673 Mm W X 673 Mm L Any Deviation May Be Plus Minus 20 Mm 20 Gauge Body Mate.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Supply And Replacement Of Compressor For 3 Point 5 Ton Cassettes Air Conditioner Detailed Scope Of Work Is Mentioned In Tender Document And Boq Attached.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; Supply And Replacement Of Compressor For 5 Point 0 Ton Pac Air Conditioner Detailed Scope Of Work Is Mentioned In Tender Document And Boq Attached Total.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1 Point 5 And 2 Ton Window Air Conditioners Removal And Shifting Of Window Type Air Conditioners From One Location To Other At Raps Site Its Installatio.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 1 Point 5 And 2 Ton Split Air Conditions Removal And Shifting Of Split Air Conditioners From One Location To Others At Raps Site Including Installation.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 3 And 4; 40 And 80 And 150 Litres Water Coolers Removal And Shifting Of Water Coolers From One Location To Other And Their Installation And Commissioning And Te.. , Repair, Maintenance, And Installation Of Plant/ 2 Total Quantity : Replacement Of Cellulose Pad Replacement Of Pad For Cellulose Pad Desert Coolers Detailed Scope Of Work Is Mentioned In Tender Document And Boq Attached Total Quantity 1 Is Equal To 25 For Two Years Total Quantity : . Last date of submission for this tender is 2025-08-29. This is a Air Conditioner tender in Chittorgarh, Rajasthan

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in