Rail Coach Factory
- AOC value
- ₹5.88L
- AOC date
- 31 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 31 Aug 23AOC date
- -Published
- -Closes
- -Bid opens
- 31 Aug 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 31/08/2023
- Authority
- Rail Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Rail Coach Factory has published Supply Of End Construction ( Alarm End ) Bhel Electric For Three Phase Memu / Dmc1 Coach, As Per Drawing: Em15281 Alt.H & Mdst102 Rev.02, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] , End Construction ( Alarm End ) With Bhel Electric For Three Phase Memu / Dmc2 Coach, As Per Drawing: Em15280 Alt.H & Mdst102 Rev.02, Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] . Last date of submission for this tender is 2023-10-11. This is a Railway Ancillaries tender in Kapurthala, Punjab
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free